翻訳と辞書 |
Beijing–Tangshan Intercity Railway : ウィキペディア英語版 | Beijing–Tangshan Intercity Railway
|} Beijing–Tangshan Intercity Railway is a Chinese High-Speed Railway connecting the national capital Beijing and Tangshan in eastern Hebei. Construction on the railway was originally scheduled to start in 2009〔(京张京唐城际铁路下半年动工 )〕 but the completion has been delayed after a nationwide rail review following the 2011 Wenzhou Rail Incident. ==Overview== The length of this intercity railway is about 160 km railway line from the Beijing Railway Station terminus. It then roughly follows along the Beijing-Shenyang Expressway northbound through the Beijing's Tongzhou District before crossing into Hebei's Xianghe County. Next it crosses Tianjin's Baodi District to re-enter Hebei at Tangshan City's Yutian County and Fengrun. Finally it terminates at Tangshan Railway Station. Total line length of will be approximately 163 km, a total of seven stations, with a design speed of 350 km.〔http://news.xinhuanet.com/politics/2009-06/15/content_11542619.htm 京唐城际铁路暂定7车站 设计速度350公里/小时〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Beijing–Tangshan Intercity Railway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|